Draft Constraints Report
Appendix 1: Cover and Flysheet
Complete Executive Summary
Complete Main Report
Study Area Figure 1
Eng and Env Constraints Map Figure 2
Overhead Line Route Corridors Figure 3
Underground Cabling Route Corridors Figure 4
Cable Interface Tower Figure 5
12m Tower Figure 6
H Timber Pole Figure 7
Suspension Tower Figure 8
Strain Tower Figure 9
Soil and Ground Conditions Figure 10
Lough Ennell Objectives Figure 11
Lough Owel Objectives Figure 12
Natura 2000 Sites Figure 13
Typical Directional Drilling Figure 14
Option 1 Line Entry Mullingar Figure 15
Option 2 Line Entry Mullingar Figure 16
Option 3 Line Entry Mullingar Figure 17
Option 4 Line Entry Mullingar Figure 18
Option 1 Line Entry Kinnegad Figure 19
Option 1 Line Entry Derryiron Figure 20
Sensitivity Ratings Figure 21
Scenic Viewsheds Figure 22
Sensitivity Hotspots Figure 23
Designated and Ecological Sites Figure 24
Ecological Plate Locations Overhead Figure 25
Cultural Heritage Constraints Figure 26
Cultural Heritage Potential Impacts Figure 27
Sensitivity Ratings Figure 28
Scenic Viewsheds Figure 29
Sensitivity Hotspots Figure 30
Designated and Ecological Sites Figure 31
Ecological Plate Locations Underground Figure 32
Cultural Heritage Constraints Figure 33
Properties Overhead Routes Figure 34
Properties Cable Routes Figure 35
Emerging Preferred Route Corridors Figure 36

